🇳🇿 New Zealand · 🏗️ Construction
How an Oil Shock Affects Construction in New Zealand
Based on a simulated +20% oil price shock (from $107 to $128/barrel) using the PriceShock engine with realistic sensitivity.
Estimated Price Impact
+8.6% to +18.3%
Range reflects supply-chain lag, local dependency, and sector sensitivity.
Breakdown by Subcategory
- Materials: +7.3% to +21.1%
- Labour Transport: +8.1% to +19.2%
- Equipment: +9% to +17.4%
- Concrete: +9.9% to +15.6%