🇲🇽 Mexico · 🏗️ Construction
How an Oil Shock Affects Construction in Mexico
Based on a simulated +20% oil price shock (from $107 to $128/barrel) using the PriceShock engine with realistic sensitivity.
Estimated Price Impact
+10.2% to +21.8%
Range reflects supply-chain lag, local dependency, and sector sensitivity.
Breakdown by Subcategory
- Materials: +8.7% to +25.1%
- Labour Transport: +9.7% to +22.9%
- Equipment: +10.7% to +20.7%
- Concrete: +11.7% to +18.5%