🇮🇪 Ireland · 🏗️ Construction
How an Oil Shock Affects Construction in Ireland
Based on a simulated +20% oil price shock (from $107 to $128/barrel) using the PriceShock engine with realistic sensitivity.
Estimated Price Impact
+8% to +17.1%
Range reflects supply-chain lag, local dependency, and sector sensitivity.
Breakdown by Subcategory
- Materials: +6.8% to +19.6%
- Labour Transport: +7.6% to +17.9%
- Equipment: +8.4% to +16.2%
- Concrete: +9.2% to +14.5%